ACTIVITY

IN THE HEALTHCARE

SECTOR

Thanks to the experience acquired in the Building sector, we have implemented Installation Control Systems throughout the Spanish geography for:

  • PRODUCTION ROOMS.

  • AIR-CONDITIONING (AIR-CONDITIONERS, AIR-CONDITIONING, FAN COILS, VRV).

  • OPERATING ROOM CONTROL.

  • INTELLIGENT LIGHTING MANAGEMENT.

  • ROOM MANAGEMENT (CLIMATE, ENERGY, GASES, ETC.).

  • FIRE INTEGRATION.

  • INTEGRATION WITH OTHER SYSTEMS (ACCESSES, CCTV, PUBLIC ADDRESS SYSTEM, ETC.).

Among our clients are:

  • Can Misses Hospital (Ibiza)
  • San Juan de Dios Hospital (Córdoba)
  • Clinical Hospital of Valladolid
  • Hellín Hospital (Albacete)
  • Denia Hospital (Alicante)
  • Josep Trueta Hospital (Girona)
  • IMQ Hospital (Bilbao)
  • Clinical Hospital of Valladolid
  • Alcoy Hospital and dependent Health Centres (Alicante)

PROJECTS COMPLETED

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies